Economic load dispatch of power plants : (Record no. 180)

MARC details
000 -LEADER
fixed length control field 01991nam a2200241 4500
001 - CONTROL NUMBER
control field UPMIN-00000009106
003 - CONTROL NUMBER IDENTIFIER
control field UPMIN
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20230209142643.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 230209b |||||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency DLC
Transcribing agency UPMin
Modifying agency upmin
041 ## - LANGUAGE CODE
Language code of text/sound track or separate title eng
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) LG993.5 2002
Local cutter number (OCLC) ; Book number/undivided call number, CALL (RLIN) A64 S23
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Sable, Ma. Virginia de Jesus.
9 (RLIN) 2302
245 00 - TITLE STATEMENT
Title Economic load dispatch of power plants :
Remainder of title an optimization model based on Mindanao grid information /
Statement of responsibility, etc. Ma. Virginia de Jesus Sable
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Date of publication, distribution, etc. 2002
300 ## - PHYSICAL DESCRIPTION
Extent 61 leaves
502 ## - DISSERTATION NOTE
Dissertation note Thesis (BS Applied Mathematics) -- University of the Philippines Mindanao, 2002
520 3# - SUMMARY, ETC.
Summary, etc. The Philippines is composed of the Luzon-Visayas Grid and the Mindanao Grid. There are many power plants located in Mindanao that provide electric energy for the area. There are three energy sources for Mindanao Grid namely: hydro, geothermal and diesel. The cost of generating electricity differs according to the source of electric energy. Moreover, power system load demand varies every hour of the day. Thus, the system has to make sure that the demand is met every hour of every day. Minimizing the cost is necessary and thus taking into consideration the different cost incurred by the different power plants in producing electricity. This study mathematically modeled an optimal typical 24-hour load dispatch of power plants in Mindanao by cost minimization. This was done by identifying the data, its characteristics and what approach in operations research is to be used in the study. Then formulating an optimization model of the load dispatch for each power plant in every hour of the day and evaluating by comparing the production cost of the actual data with the results generated by the model. This study is applicable to other types of load dispatch data that have the same characteristics as that of the Mindanao Grid data.
658 ## - INDEX TERM--CURRICULUM OBJECTIVE
Main curriculum objective Undergraduate Thesis
Curriculum code AMAT200,
Source of term or code BSAM
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN)
a Fi
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN)
a UP
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Library of Congress Classification
Koha item type Thesis
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Status Collection Home library Current library Shelving location Date acquired Source of acquisition Accession Number Total Checkouts Full call number Barcode Date last seen Price effective from Koha item type
    Library of Congress Classification   Not For Loan Preservation Copy University Library University Library Archives and Records 2004-07-29 donation UAR-T-gd380   LG993.5 2002 A64 S23 3UPML00020795 2022-09-21 2022-09-21 Thesis
    Library of Congress Classification   Not For Loan Room-Use Only College of Science and Mathematics University Library Theses 2002-06-20 donation CSM-T-1055   LG993.5 2002 A64 S23 3UPML00010960 2022-09-21 2022-09-21 Thesis
 
University of the Philippines Mindanao
The University Library, UP Mindanao, Mintal, Tugbok District, Davao City, Philippines
Email: library.upmindanao@up.edu.ph
Contact: (082)295-7025
Copyright @ 2022 | All Rights Reserved